FEEDBACK

Technical Management Regulations for Railway (Conventional Speed Railway)

Price: $215.12 $151.16 (Save $63.96)
Only 1 left in stock, order soon.
Add to Wishlist

  • Language: English
  • Page: 384
  • Publication Date: 08/2019
  • ISBN: 9787113260392
  • Publisher: China Railway Press
Details
The English version has been translated from Technical Management Rules Regulations for Railway(TG/01-2014, TG/OIA-2017) published by China Railway Publishing House Co.,Ltd., whose copyright is reserved by CHINA RAILWAY. In case of any discrepancies between the Chinese and English, the Chinese version shall prevail.
This version, as the basic regulations for technical management of China national railways, which, in compliance with relevant procedures and regulations, is translated by Science & Technology Information Research Institute of China Academy of Railway Sciences Corporation Limited authorized by Department of Science, Technology and IT Application of CHINA RAILWAY.
Many thanks should go to relevant departments of CHINA RAILWAY and the staff from relevant organizations anCl groups like Beijing Jiaotong University, Southwest Jiaotong University,Central South University, Tongji University, Dalian Jiaotong University, Shijiazhuang Tiedao University, Lanzhou Jiaotong University, CRSC Research & Design Institute Group Co., Ltd.,China Railway First Survey and Design Institute Group Co.,Ltd., China Railway Eryuan Engineering Group Co., Ltd., China Railway Siyuan Survey and Design Group Co., Ltd., CRRC Qingdao Sifang Co., Ltd., CRRC Changchun Co., Ltd., CRRC Qishuyan Institute Co., Ltd., Bridge Design Institute of Railway Engineering Consulting Group Co., Ltd., China Railway Electrification Engineering Group Co., Ltd., and CASCO and etc., who have provided great support through their hard work.
 
Table of Contents
General
Part Ⅰ TechnicaIEquipment
Chapter 1 General Requirements
Construction, manufacture, acceptance and handover
Gauge and protection zone
Maintenance, repair and inspection
Rescue equipment
Disaster protection
Train safety monitoring equipment
Chapter 2 Track, Bridge and Tunnel
General requirements
Railway track
Track plan and profile
Subgrade
Bridge and tunnelstructures
Track
Level crossing, track crossing and junction
Catch siding and refuge siding
Safety fence
Sound barrier
Chapter 3 Signal & Communication
General requirements
Signal
Interlocking
Block system
Train dispatching command system and centralized dispatch and command
Cab signal, train operation monitoring and controlling device, track car monitoring and controlling device
CTCS -2 train control system
CentraLized signal monitoring system
Hump signal
Automatic signal and notification at level crossing
Communication
Carrying network
Service network
Supporting network
Signaling and communication cable lines and others
Chapter 4 Railway Information System
Chapter 5 Station and Hub
Station and yard facilities
Passenger transport equipment
Freight transport equipment
Chapter 6 Rolling Stock
Locomotive-related facilities
Locomotive
Car-related facilities
Car
……
Part Ⅱ Organization of Train Operation
Part Ⅲ Signal Indication
Sample Pages Preview
Sample pages of Technical Management Regulations for Railway (Conventional Speed Railway) (ISBN:9787113260392)
Sample pages of Technical Management Regulations for Railway (Conventional Speed Railway) (ISBN:9787113260392)
Sample pages of Technical Management Regulations for Railway (Conventional Speed Railway) (ISBN:9787113260392)
Sample pages of Technical Management Regulations for Railway (Conventional Speed Railway) (ISBN:9787113260392)
Technical Management Regulations for Railway (Conventional Speed Railway)
$151.16