| 1 | Take subway line 10 and get off at Xitucheng station Exit (South-east corner of Beihang University campus) then 5 minutes walk to Campus. | |
| 2 | Based on the deep foundation pit of line 3 in Shenzhen metro, using the method of finite difference, established FLAC3D numerical model. | |
| 3 | The MTR Corporation established three Community Liaison Groups (CLGs) for Sai Ying Pun, HK University and Kennedy Town sections of the Line in order to keep close contact with the society. | |
| 4 | Xierqi Station is the terminal of Changping Line(opening at the end of 2010). It will also become the transfer station between Beijing Subway Line 13 and Changping Line. | |
| 5 | According to the overpass bridge project of Miaohong Line in Pingdingshan, the construction technology of cast-in-situ concrete continuous box beam is introduced. |