| 1 | Store the quicklime and gypsum in the tank after crushing and ball milling. | |
| 2 | Run of Mine (ROM) ore will be dumped onto a Grizzley above the Coarse Ore bin. | |
| 3 | Once the flow channel has emptied, all flow from the silo stops. | |
| 4 | The homogenization principle of gravity blending silo and the working principle of blending pipe are recommended. | |
| 5 | Star unloader can be used in the system of collection, as the hopper of the discharger. |